大鸡巴在线观看一区二区,久久蜜臀亚洲AV无码久久,国产又粗又大又长又黄视频,AV小说入口一区二区三区,国产理论,带良家美女按摩师开房,浴室没忍住就干,一级片二区,三区 ,美女日皮,亚洲午夜一区二区三区四区,特黄欧美三级a在线播放,中国毛片啊操我好痒

Engineering and EPC
Service support - Full life cycle services - Service product display

1, engineering explosion-proof safety assessment

New project-on-site inspection and evaluation of explosion-proof safety of new project: issue an evaluation report after evaluation;

Projects that have been put into production —— On-site inspection and evaluation of staged explosion-proof safety of projects that have been put into production;

Reconstruction and expansion project —— Adaptability and conformity between selection and construction of reconstruction and expansion project and dangerous environment ……


2, dust environmental safety assessment and explosion-proof transformation

For: places with dust explosion danger in industries such as steel and food.

Content: According to GB3836, GB12476 and other standards and process flow, identify the sources of combustible dust emission, divide the hazardous areas, and propose the selection and transformation scheme of electrical equipment, which can be implemented.

Inspection and inspection institutions with explosion-proof professional qualifications shall conduct inspection and evaluation according to GB 50257 Code for Construction and Acceptance of Electrical Equipment in Explosion and Fire Hazardous Environment of Electrical Equipment Installation Engineering. Obtain compliance safety evaluation report


3. Gas to electricity

Typical scheme

Background: Steam generated by small coal-fired boilers is used to drive steam turbines, and then high-speed air compressors, superchargers, fans and other equipment. In order to solve the environmental pollution problem of small coal-fired boilers, the steam turbine drive is directly changed to high-speed motor drive.


1609125414888065fOo1.png


Process flow of motor overhaul


圖片1.png


Construction process of maintenance and overhaul of fan


image.png